Retail Client: Best Buy Union, NJ
Location: Union, NJ
Length: 5 Weeks
General Scope: DWM was contracted to resolve a critical structural issue at a Best Buy location where repeated impacts from tractor trailers backing into the loading bay had caused significant damage to the exterior of the building.
The project scope included:
β’ Erecting a temporary wall to maintain security.
β’ Selective demolition of 60 feet of the CMU (concrete masonry unit) exterior wall.
β’ Reconstruction of the damaged structure.
β’ Installation of new dock equipment to prevent future damage.
From initial request to project completion, we successfully procured drawings, obtained permits, mobilized, and completed the work in just 5 weeks. The project was delivered on time, ensuring the client met their critical Black Friday operational timeline.